electric vehicle (EV) charging station foundation for level 2 chargers

EV CHARGING STATION FOUNDATION

PLP’s EV Charging Station Foundation is a pre-fabricated, precision-engineered solution for EV charging. This durable yet lightweight polypropylene foundation requires no specialized machinery; it can be installed by one person in one day. The EV Charging Station Foundation’s design adapts to fit a wide range of chargers and charger pedestals/poles currently on the market. The aluminum top plate provides a clean finish, is easy to drill, and is an access point for repairs and future upgrades.

electric vehicle (EV) charging station foundation ready for contractor to install

EFFICIENT

Quick and easy installation

  • Pre-manufactured design

  • Easily installed by one person in one day

  • Reduces construction time by weeks

  • Quick and easy site-prep

  • No concrete required

electric vehicle (EV) charging station foundation with top plate and level 2 charger installed

DURABLE

Designed and tested to withstand the harshest environmental conditions

  • Manufactured from durable, weather-resistant polypropylene

  • Tier 15-Rated (22,000 lb compression strength)

  • 150 mph wind tested

  • High water table resistant

  • Frost heave resistant

electric vehicle (EV) charging station foundation with wiring for level 2 charger

FLEXIBLE

Creates a convenient access point for chargers

  • Cast aluminum top plate provides easy access for future installs

  • Accommodates most Level 2 chargers and charger pedestals

electric vehicle (EV) charging station foundation with conduit for wiring

VERSATILE

Multiple wiring configurations

  • Daisy-chain

  • Dead-heading

  • Change-of-direction

  • Accepts up to 4-inch conduit

electric vehicle (EV) charging station foundation with level 2 charger installed

FUTURE-PROOF

Saves you time and money compared to traditional construction methods

  • Make-ready solution prevents future infrastructure disruptions

  • Install multiple foundations today and add charging units over time

  • Mitigates the need to break ground as the demand increases

  • Universal fitting system easily accommodates different Level 2 charging station models

  • Cast aluminum top plate access point makes for easy repairs and replacements

Next
Next

EV CHARGER BUMP BARRIER